|
Product Information
Nikzad Urethane is a new and improved urethane wood
adhesive. It is specially formulated for bamboo, exotic
woods, engineered plank - 3 and 5 ply, solid plank flat-milled
up to 1/2", 3/4" solid shorts, acrylic impregnated
wood, parquet and plywood. Nikzad Urethane Adhesive
provides high initial track, low odor and excellent
permanent adhesion. Nikzad Urethane Adhesive is V.O.C.
compliant. It is a trowel applied adhesive with excellent
coverage. Nikzad Urethane adhesive is a water-resistant
adhesive which provides some vapor-retarding characteristics
to wood flooring installations. It is recommended by
installers for both residential and commercial installations.
Reliable
-
High Quality Performance
Environmentally
Friendly
-
V.O.C. Compliant
Flooring
Types
| -
Bamboo |
-
3/4" Solid Shorts |
| -
Exotic Woods |
-
Acrylic Impregnated Wood |
| -
Engineered Plank- 3 and 5 ply |
- Parquet |
| -
Solid Plank Flat- milled up to 1/2" |
- Plywood |
Features/Benefits
| -
Permanent Bond |
-
High Initial Tack |
| -
Contains No Water |
-
Superior Coverage |
| -
Freeze-Thaw Stable |
-
Non-Slumping |
| -
Low Odor |
-
Nonflammable |
| -
Remains Elastomeric-Responds to Expanding/Contracting
Wood |
| -
Available in 2-gallon and 4-gallon containers |
| -
For "above, on or below" grade installations
|
Nikzad Urethane is moisture resistant, however, to prevent
damage to the flooring from subfloor moisture, carefully
follow the wood manufacturer's instructions.
Concrete
Subfloors
Concrete
should be at least 60 days old. Test the concrete before
installing flooring over it. First inspect for any wetness
at the base of the drywall or for visible signs of moisture
on the concrete. Second, test for moisture. Nikzad Urethane
is not recommended for concrete subfloors with hydrostatic
head. Use a Tramex Concrete Moisture Encounter meter
for reliable concrete testing. The Tramex meter should
be pressed firmly to the subfloor for an accurate reading.
The maximum reading on concrete for wood installations
should not exceed Manufacturer's recommendations. Many
wood flooring products can be installed over lightweight
concrete (less than 3000 PSI) providing the surface
is properly prepared. Follow the concrete manufacturer's
recommendation for the application of a surface hardener/sealer.
Radiant heated subfloors should be turned off 24 hours
prior to and during installation to prevent premature
curing of the adhesive.
-Preparation
- all floors should be flat to within 3/16" in
10 feet or 1/8" in 6 feet
-Smooth
and Flat - Remove any high spots with a terrazzo grinder
or Carborundum stone and fill any low spots with a
good quality cementitous-based latex patch mix
-Clean
- It is recommended that all concrete be scoured with
#3-1/2 open coat sandpaper to remove dirt or any surface
contamination such as paint, grease, oil, sealers,
waxes and curing compounds. Nikzad Urethane adhesive
should not be used over these substances. Sweep or
vacuum the concrete before installation.
Plywood,
Oriented Strand Board (OSB), Particle Board or Wood
Subfloors
Caution:
Subfloors with high moisture content may shrink at a
later date causing cracks to appear in the wood floor
Before
installing over any one of these subfloors, test for
moisture using a reliable moisture meter such as the
Tramex Wood Moisture Meter or equivalent. The moisture
content should not exceed 14%. If it is over 14%, either
wait until the subfloor is drier or stabilize the subfloor
with an additional layer of ¼" plywood.
All joints in subflooring materials should have 1/8"
expansion space around all panels. If expansion space
is not present, cut around and through the panel joints
with a circular saw. When installing a plywood sheet
subfloor over concrete, use a ¼" x ¼"
square notched trowel to apply adhesive. Score 3/8"
deep every 8 to 10 inches on 4'x 4' sheets of ¾"
exterior. Set 4'x 4' sheets into wet adhesive. Apply
weight as necessary and allow to cure overnight.
Approved
Subfloors
-Plywood
-A.P.A. PS2-92 rated particleboard
-Terazzo and ceramic tile
-Vinyl tile flooring coated with vinyl primer
-Concrete; above, on or below grade
-Non-cushioned fully adhered sheet vinyl
-Underlayment grade O.S.B.
-Light weight concrete (coated with latex primer)
Trowels and Coverage |
Floor Type |
Trowel |
Coverage |
|
3 and 5 ply engineered plank |
|
50 sq. feet/gal. |
| |
3/16" x 3/16" x 5/32" V Notch |
|
5/16" solid parquet, 5/16"tp 3/8" solid strip, 1/4" engineered laminate, inllays |
|
80 sq. feet/gal. |
| |
1/8" x 1/8" x 1/8" Square Notch |
|
|
3/4" solid wood planks/shorts 4' x 4' plywood |
|
35 sq. feet/gal. |
| |
1/4" x 1/4" x 1/4" Square Notch |
|
|
Greater than 1/2" engineered plank and 3/4" parquet |
|
40 sq. feet/gal. |
| |
1/4" x 1/4" x 1/8" Square Notch |
|
|
Use urethane with a proprly notched trowel. Nikzad Warranties do not cover problems caused by improper use of installation products. Follow flooring manufacturer's written installation instructions. |
|